
Ralph Ilic
Owner and crew lead
Runs Monday on most jobs: covering, repairs and caulking, room by room, and is back on Friday for the walk-through.
House painters in Pittsburgh, Pennsylvania
We are Ralph, his daughter Lindsay and a crew of six. Before the job starts, you get the week on one page: what happens each day, and the name and face of each person on site.

Week one
A typical interior job runs Monday to Friday, after a walk-through the week before. Your own days are written into your estimate.
Lindsay walks the rooms with you, we settle the colors on the wall itself, and a written estimate follows.
On site: Lindsay Ilic and Ralph Ilic

Floors, stairs and furniture are covered before a can is opened.
On site: Ralph Ilic and Drew Schultz

Patches get sanded flush and spot-primed.
On site: Matt Dunne and Drew Schultz

Ceilings first, then walls, cut in by hand at the edges.
On site: Molly Bracken and Drew Schultz

A second coat where the first needs it, then baseboards, casings and stair trim.
On site: Molly Bracken, Matt Dunne and Kelvin Chatman

Doors and cabinet fronts get their final coat, the tape comes off, and the floors are cleaned.
On site: Staci Galanis, Lindsay Ilic and Ralph Ilic

The crew
Ralph and Lindsay own the firm. Nobody is sent to your house you have not seen on the schedule first.

Owner and crew lead
Runs Monday on most jobs: covering, repairs and caulking, room by room, and is back on Friday for the walk-through.

Co-owner and project lead
Walks the house with you before the job and again on Friday. Writes your estimate and the week's schedule.

Painter, priming and walls
On site Tuesday and Thursday: sanding, priming and walls.

Painter, walls and ceilings
On site Wednesday and Thursday: first and second coats.

Painter, trim and stairs
On site Thursday: baseboards, casings, railings and stair trim.

Finish painter, doors and cabinets
Sprays doors, trim and cabinet fronts, in the shop and on site. On site Friday.

Painter, prep and ceilings
On site Monday to Wednesday: patching, sanding and ceilings.
Office and scheduling
Answers the phone, books the week and texts you the plan.
What we paint

Walls, ceilings and closets, with plaster and drywall repairs done first.
Interior painting
Siding, trim, porches and railings, with ladders and scaffold set for hillside lots and tall fronts.
Exterior painting
Baseboards, casings, railings and doors, brushed or sprayed for a smooth finish.
Interior painting
Doors and drawer fronts taken to the shop, sprayed, and hung back on the frames.
Interior paintingHow pricing works
We don't quote by phone. Here is what moves the figure and what the written estimate lists.
Surfaces and areas, prep and repairs, coats, how many colors, height and access, and the grade of paint.
Every surface, repairs, coats, products and sheens, colors, cleanup, the schedule and the payment schedule.
Lindsay or Ralph walks the house, measures, and asks what bothers you about it.
In writing after the walk-through, with the week's days and names on the back.
From the neighbors
“The text said who was coming each morning, and that is who came. Kelvin did the stair railings I had put off for years.”
“Lindsay measured, wrote everything down, and the week matched the estimate. Nothing on the list changed.”
“They covered the whole stair hall before opening a can, and the floor was clean on Friday.”
“Ralph told me on Monday that the porch ceiling needed more prep than we had planned. He showed me, and we agreed on the change in writing.”
Sample reviews.
Where we paint
Type your ZIP and see whether we come to you.
We don't paint outside Allegheny County, and we don't take high-rise or commercial jobs.
Questions
A typical two-bedroom-and-hall interior takes a week, Monday to Friday. Larger jobs and exteriors run longer; your estimate gives the days for your house.
Each surface, the repairs, the coats, the products and sheens, the colors, cleanup, the schedule, the payment schedule and the warranty terms.
No. We cover floors and furniture, and keep one path clear. You decide which rooms are off limits and when.
Yes. EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in homes built before 1978. Tell us the year when you call; the firm number is in the footer.
The people named on your schedule, and no one else. If a day changes, we text you the new name before they arrive.
We do, and the estimate names the product line and sheen. Ask for the product data sheet and we send it.
Get started
We reply from the office, Monday to Friday, with a time for the walk-through.